Hardi 600/7 Pump on Galvanised Base. Installed Quairading
Two Panel Array Packed for Transport.
Lorentz PS2-600 System with AC PowerPack. Installed in Dam, The Lakes, W.A.
Lorentz System with 2 x 1350W Pole Mount Arrays installed in Yerecoin.
Lorentz PS2-600 System with External Pump Chamber.
Dual Pump System with 4440W Array and 20KWH Battery Backup installed for the Shire of Merredin.
3 x 1480W Pole Mount Arrays installed at site in Kukerin.
New Headworks with Cabinet Mounted Controller installed at site in Exmouth.
Hardi Trailer Systems with 740W Arrays
New 250KL Tanks Supplied and Installed
990W Trailer Mounted Array